Project Description

Air Conditioning – Central Plant Upgrade

  • Convert base building air-conditioning from local water cooled packaged systems to central chilled water plant with local chilled water fan coil
  • Installation of 1 x 600kw Power Pax
  • Installation of 1 x 300kw Power Pax
  • Installation of complete chilled and condenser water pipework system including CH/W risers throughout 9 levels.
  • Installation of associated pumps header tanks and dosing system etc.
  • Convert water cooled packaged systems to chilled water fan coil
  • Installation of new mechanical services switchboard and sub mains to
  • All chiller works completed with in-house Velocity Air staff by agreement with Boronia