Gateway Building:  1 Macquarie Place SydneyX


Project: Building Energy Upgrades
Separated into the following Packages:
    PAC 1 – Boiler System Upgrade   PAC 2 – Skin AHU System Upgrade
  • Installation of Skin System VAV Boxes throughout the building.
  • PAC 3 – Domestic Hot Water Upgrade
  • Installation of new Heat Recovery Domestic Hot Water Plant.
  • PAC 4 – Car Park Ventilation Upgrade    PAC 5 – AHU Dampers Upgrade
  • Upgrade the Building Economy Cycle System

Client:

Dexus

Consultant:

ARUP


Gateway