11 Argyle Street, Newcastle: Completed September 2010
X
Client: |
Eureka Funds
|
Project Manager: |
CBRE |
- Decommission 2 x 200kw reciprocating Trane chillers and associated direct expansion system.
- Install 1 x Power Pax Chiller 460kw.
- Removal of evaporative condenser and install 2 x induced draft fibreglass cooling towers.
- Convert DX cooling coils to chilled water colis.
- Install new chilled and condenser water pipework systems.
- Installation of 9 x variable speed drives to chilled/condenser water pumps and cooling tower fans.
- Major modifications to air distribution system to maximise free cooling cycle.
- Installation of new Building Management System.
- All chiller works completed with in-house Velocity Air staff by agreement with Smardt Chillers.

Existing DX system and tower to be replaced
with chilled water plant

New equipment lifted into place

Modified Return Air ductwork with a new spill
air economy cycle added

New Plant